Together, ATI and T& J have been providing data, voice, fiber optic and electronics support for many in the petro-chem, manufacturing and industrial
applications for more than 17 years. We have also been involved with many projects in high profile office and retail environments.

CARMAX - Southwest Freeway, Houston
Installed over 1200 Voice/Data drops and fiber optic cable to accomodate gate control and paging system.

OILTANKING - Houston, Pasadena, Texas City and Port Arthur
Installed over 10 miles of fiber optic cable for use in their automation and control systems. Along with T & J Electronic Systems, we have installed and continue to
maintain the cameras that are very vital to their operation. When a train derailed in their Houston facility, and a fire destroyed one of their main fiber trunks, our
team restored operations within 8 hours.

TEXAS NEW MEXICO POWER, ONCOR, TXU ENERGY
Installation of fiber optic cables, terminations, testing and documentation for grid monitoring and control.

QUANTUM CHEMICAL (Millenium Petro-Chem)
In 1994, ATI was contracted to provide a complete Voice/Data network for the La Porte, Chocolate Bayou and Port Arthur complex. This included 500,000' of UTP and 100,000' of fiber optic cable.
As Quantum grew, the ATI team was there to help. When Quantum transitioned to Millennium Petro-Chem and consolidated, ATI was there to make the necessary changes.

ENTERPRISE PRODUCTS
From offices on the North Loop in Houston to facilities at Morgan's Point and Mont Belvieu, ATI has installed Voice/Data and fiber optic cable. In Mont Belvieu we placed 13 miles of muti-fiber cable for
use in their administrative network and DCS systems. ATI also installed cable at Enterprise locations in Boling, Tx and Manvel, Tx.

AON
In 2001 AON leased 9 1/2 floors of one building in Four Oaks Place. ATI provided complete construction of the Voice/Data systems for the entire build-out comprising 150 stations per floor, all tie cables
risers, data center, paging, music and white noise speakers. The team assisted AON personnel with the migration to the new location. This included moving critical equipment ie; servers and power supplies
(UPS). ATI also assisted Siemans with the telephone roll-out.

RICOH Business Solutions
In 2003, ATI was called upon to troubleshoot cable. Since then, ATI has installed or reworked cabling for the entire office and showroom at the 2900 North Loop West complex. We have recently
installed a Wilson Cellular Amplifier System in order that personnel working in the basement suites have access cellular signals. ATI completed
projects for the 3100 Wilcrest office and service center northwest of Houston.